Your Answer ▼
The map illustrates how a road access has been changed to a city hospital from 2007 to 2010. Overall, there has been extended in the space for car parking, being purposed for public and staff, meanwhile getting better access to the hospital with developed bus station.
It is worth to discover that there was a big development in road around city hospital over the period given. In 2007, one main ring road was surrounding the hospital, which was connected with city road through hospital road, where has six bus stops on the side. In regards to 2010, these roads have been rebuilt as two roundabout at the meeting point of the two roads, between ring road and hospital road, and also between hospital road and city road.
In terms of facilities, there was one area for car parking in 2007, east side of hospital road, next to the bus stops. This area was used by staff and public together, that has been separated later into two part of parking lot in 2010. In 2010, public can use the place for parking, where is of the east to the hospital, while staff can park their cars the place of south to the hospital. Bus station was built newly on the west of hospital road with possibly accessing through both roundabouts.
20분소요 219words |